2050 Stress Test·Palo Verde

3

Nuclear·(OP) Operating·Fuel NUC·on Palo Verde
Nameplate
1403.2 MW
Net summer
1312.0 MW
Technology
Nuclear
In service
1988-01-01

Performance Analysis

Actuals only · EIA generation — no forecast run yet
Annual generation
31.32TWh
trailing 12 mo · actual
Capacity factor
84.9%
actual · ÷ 4210 MW
Peak month
Jan '25
2.98 TWh
Lowest month
Apr
1.85 TWh
Historical mean window2015-12 – 2025-12 · 121 mo · mean 2.65 TWh

Dashed line = mean of actual generation over the window above. Adjust to exclude partial/ramp months — a fixed all-history mean can mislead.

Actual (EIA)Hist. meanActual EIA generation — no forecast run yet

Hazard Exposure

Detailed analysis hasn't been run. Modeled hazard populates this section once you run it · modeling_hazard_plant.

~seconds · workspace baseline

Insurance Gap Analysis

Roadmap · unit-level gap when underwriting allows

Coming soon. Per-unit premium gap for unit-priced products (turbine warranties, cell-replacement riders); shared coverage defers to plant-level.

Roadmap
generator_id: 73d8963c-e154-47d2-bfe5-ae7e58f9cae3·variant · baseline