2050 Stress Test·Mustang Two

M2WHI

Solar Photovoltaic·(OP) Operating·Fuel SUN·on Mustang Two
Nameplate
100.0 MW
Net summer
100.0 MW
Technology
Solar Photovoltaic
In service
2020-11-01

Performance Analysis

Actuals only · EIA generation — no forecast run yet
Annual generation
396.3GWh
trailing 12 mo · actual
Capacity factor
30.2%
actual · ÷ 150 MW
Peak month
Jul
52.0 GWh
Lowest month
Dec
7.7 GWh
CAISO · node CABALLO3_7_N001 · hub TH_ZP26_GEN-APND
Historical mean window2020-11 – 2025-12 · 62 mo · mean 31.6 GWh

Dashed line = mean of actual generation over the window above. Adjust to exclude partial/ramp months — a fixed all-history mean can mislead.

Actual (EIA)Hist. meanActual EIA generation — no forecast run yet

Hazard Exposure

Detailed analysis hasn't been run. Modeled hazard populates this section once you run it · modeling_hazard_plant.

~seconds · workspace baseline

Insurance Gap Analysis

Roadmap · unit-level gap when underwriting allows

Coming soon. Per-unit premium gap for unit-priced products (turbine warranties, cell-replacement riders); shared coverage defers to plant-level.

Roadmap
generator_id: 9c35d1f0-f2de-40bd-8cc3-48d5faf6ddef·variant · baseline