- Nameplate
- 500.0 MW
- Net summer
- 500.0 MW
- Technology
- Solar Photovoltaic
- In service
- 2025-12-01
Performance Analysis
Actuals only · EIA generation — no forecast run yet
Annual generation
0MWh
trailing 12 mo · actual
Capacity factor
0.0%
actual · ÷ 1000 MW
Peak month
Dec
0 MWh
Lowest month
Dec
0 MWh
CAISO · node BELLEF_7_CN01 · hub TH_SP15_GEN-APND
Historical mean window2025-12 – 2025-12 · 1 mo · mean 0 MWh
Dashed line = mean of actual generation over the window above. Adjust to exclude partial/ramp months — a fixed all-history mean can mislead.
Actual (EIA)Hist. meanActual EIA generation — no forecast run yet
Hazard Exposure
Detailed analysis hasn't been run. Modeled hazard populates this section once you run it · modeling_hazard_plant.
~seconds · workspace baseline
Insurance Gap Analysis
Roadmap · unit-level gap when underwriting allows
Coming soon. Per-unit premium gap for unit-priced products (turbine warranties, cell-replacement riders); shared coverage defers to plant-level.