Build a new prospect from a template — greenfield, planned, or hypothetical projects that aren't in EIA yet.
Natural gas combined-cycle plant, F-class turbines in a 2×1 block (two gas turbines feeding one steam turbine). Default 700 MW.
Solar + battery hybrid, DC-coupled through a shared inverter. Default 200 MW solar + 100 MW / 400 MWh BESS.
Wind + battery storage hybrid (AC-coupled). Default 150 MW wind + 100 MW / 200 MWh BESS. Two generator rows.
Simple-cycle gas turbine (peaker). Higher heat rate than CCGT, fast start. Default 150 MW.
Wind farm with 4 MW class turbines (modern 2022+ vintage, larger rotor + taller hub). Default 120 MW (30 turbines).
Utility-scale battery storage, 2-hour duration. Default 100 MW / 200 MWh — same energy as the 4-hour template but higher power.
Wind farm with 2.5 MW class turbines (typical 2015–2020 vintage). Default 100 MW (40 turbines).
Utility-scale solar farm with single-axis tracking, monofacial panels. Default 100 MW; one generator row at the configured capacity.
Utility-scale battery storage, 4-hour duration. Default 50 MW / 200 MWh (LFP chemistry, ~88% RTE).
Utility-scale solar with fixed-tilt mounting (lower capex, slightly lower yield than tracked). Default 50 MW.
Composed hybrid asset (solar+bess)
Empty template for users who want full manual control. One generator placeholder; all type-specific fields blank. Use this when the curated templates do not match what you are modeling.
Search plants, projects, owners, and states