Q3 Outlook·Lower Baker

4

Conventional Hydroelectric·(OP) Operating·Fuel WAT·on Lower Baker
Nameplate
23.1 MW
Net summer
23.1 MW
Technology
Conventional Hydroelectric
In service
2013-07-01

Performance Analysis

Actuals only · EIA generation — no forecast run yet
Annual generation
326.7GWh
trailing 12 mo · actual
Capacity factor
35.9%
actual · ÷ 104 MW
Peak month
Nov
50.3 GWh
Lowest month
Sep
11.6 GWh
Historical mean window2015-12 – 2024-12 · 109 mo · mean 27.6 GWh

Dashed line = mean of actual generation over the window above. Adjust to exclude partial/ramp months — a fixed all-history mean can mislead.

Actual (EIA)Hist. meanActual EIA generation — no forecast run yet

Hazard Exposure

Detailed analysis hasn't been run. Modeled hazard populates this section once you run it · modeling_hazard_plant.

~seconds · workspace baseline

Insurance Gap Analysis

Roadmap · unit-level gap when underwriting allows

Coming soon. Per-unit premium gap for unit-priced products (turbine warranties, cell-replacement riders); shared coverage defers to plant-level.

Roadmap
generator_id: 56ba72a3-debe-4cf7-8ee6-65e46c9ffd30·variant · baseline