Q3 Outlook·Sumas Power Plant

GEN2

Natural Gas Fired Combined Cycle·(OP) Operating·Fuel NG·on Sumas Power Plant
Nameplate
37.7 MW
Net summer
40.8 MW
Technology
Natural Gas Fired Combined Cycle
In service
1993-03-01

Performance Analysis

Actuals only · EIA generation — no forecast run yet
Annual generation
675.8GWh
trailing 12 mo · actual
Capacity factor
61.5%
actual · ÷ 126 MW
Peak month
Jan '24
93.9 GWh
Lowest month
Apr
0 MWh
Historical mean window2015-12 – 2024-12 · 109 mo · mean 40.7 GWh

Dashed line = mean of actual generation over the window above. Adjust to exclude partial/ramp months — a fixed all-history mean can mislead.

Actual (EIA)Hist. meanActual EIA generation — no forecast run yet

Hazard Exposure

Detailed analysis hasn't been run. Modeled hazard populates this section once you run it · modeling_hazard_plant.

~seconds · workspace baseline

Insurance Gap Analysis

Roadmap · unit-level gap when underwriting allows

Coming soon. Per-unit premium gap for unit-priced products (turbine warranties, cell-replacement riders); shared coverage defers to plant-level.

Roadmap
generator_id: a9ed174f-98a5-419c-aafb-b2ce031e33ae·variant · baseline