Q3 Outlook·Ferndale Generating Station

CT1A

Natural Gas Fired Combined Cycle·(OP) Operating·Fuel NG·on Ferndale Generating Station
Nameplate
95.9 MW
Net summer
86.0 MW
Technology
Natural Gas Fired Combined Cycle
In service
1994-04-01

Performance Analysis

Actuals only · EIA generation — no forecast run yet
Annual generation
1.32TWh
trailing 12 mo · actual
Capacity factor
53.0%
actual · ÷ 286 MW
Peak month
Aug
182.1 GWh
Lowest month
Nov
0 MWh
Historical mean window2015-12 – 2025-12 · 121 mo · mean 93.1 GWh

Dashed line = mean of actual generation over the window above. Adjust to exclude partial/ramp months — a fixed all-history mean can mislead.

Actual (EIA)Hist. meanActual EIA generation — no forecast run yet

Hazard Exposure

Detailed analysis hasn't been run. Modeled hazard populates this section once you run it · modeling_hazard_plant.

~seconds · workspace baseline

Insurance Gap Analysis

Roadmap · unit-level gap when underwriting allows

Coming soon. Per-unit premium gap for unit-priced products (turbine warranties, cell-replacement riders); shared coverage defers to plant-level.

Roadmap
generator_id: a8cd2a02-ae8d-4313-8d7b-3c2748283960·variant · baseline