Q3 Outlook·Goldendale Generating Station

G1

Natural Gas Fired Combined Cycle·(OP) Operating·Fuel NG·on Goldendale Generating Station
Nameplate
188.5 MW
Net summer
153.1 MW
Technology
Natural Gas Fired Combined Cycle
In service
2004-08-01

Performance Analysis

Actuals only · EIA generation — no forecast run yet
Annual generation
2.10TWh
trailing 12 mo · actual
Capacity factor
79.2%
actual · ÷ 303 MW
Peak month
Dec
221.5 GWh
Lowest month
May
40.0 GWh
Historical mean window2015-12 – 2024-12 · 109 mo · mean 138.0 GWh

Dashed line = mean of actual generation over the window above. Adjust to exclude partial/ramp months — a fixed all-history mean can mislead.

Actual (EIA)Hist. meanActual EIA generation — no forecast run yet

Hazard Exposure

Detailed analysis hasn't been run. Modeled hazard populates this section once you run it · modeling_hazard_plant.

~seconds · workspace baseline

Insurance Gap Analysis

Roadmap · unit-level gap when underwriting allows

Coming soon. Per-unit premium gap for unit-priced products (turbine warranties, cell-replacement riders); shared coverage defers to plant-level.

Roadmap
generator_id: 43be2c4c-1603-4c85-90c5-a8b70cd6c702·variant · baseline