Q3 Outlook·Mint Farm Generating Station

1STG

Natural Gas Fired Combined Cycle·(OP) Operating·Fuel NG·on Mint Farm Generating Station
Nameplate
133.0 MW
Net summer
120.0 MW
Technology
Natural Gas Fired Combined Cycle
In service
2008-01-01

Performance Analysis

Actuals only · EIA generation — no forecast run yet
Annual generation
2.31TWh
trailing 12 mo · actual
Capacity factor
82.5%
actual · ÷ 319 MW
Peak month
Jan '24
220.2 GWh
Lowest month
May
32.7 GWh
Historical mean window2015-12 – 2024-12 · 109 mo · mean 135.4 GWh

Dashed line = mean of actual generation over the window above. Adjust to exclude partial/ramp months — a fixed all-history mean can mislead.

Actual (EIA)Hist. meanActual EIA generation — no forecast run yet

Hazard Exposure

Detailed analysis hasn't been run. Modeled hazard populates this section once you run it · modeling_hazard_plant.

~seconds · workspace baseline

Insurance Gap Analysis

Roadmap · unit-level gap when underwriting allows

Coming soon. Per-unit premium gap for unit-priced products (turbine warranties, cell-replacement riders); shared coverage defers to plant-level.

Roadmap
generator_id: 5065b494-3972-4d38-bec8-5deb0f4d1774·variant · baseline