Q3 Outlook

Wild Horse

EIA plant_id 56322·Public page
Compare with…

Key facts

Capacity
Primary fuel
Status
Operating since
Generators
State
County
ISO / RTO
Balancing authority
Owner
Rank in state
Rank in US

Performance Analysis

Actuals only · EIA generation — no forecast run yet
Annual generation
591.0GWh
trailing 12 mo · actual
Capacity factor
24.7%
actual · ÷ 273 MW
Peak month
Mar
62.6 GWh
Lowest month
Jan '25
27.5 GWh
Historical mean window2015-12 – 2025-12 · 121 mo · mean 52.8 GWh

Dashed line = mean of actual generation over the window above. Adjust to exclude partial/ramp months — a fixed all-history mean can mislead.

Actual (EIA)Hist. meanActual EIA generation — no forecast run yet

Hazard Exposure

Detailed analysis hasn't been run. Modeled hazard populates this section once you run it · modeling_hazard_plant.

~seconds · workspace baseline

Insurance Gap Analysis

Roadmap · combines productivity + hazard above

Coming soon. Premium gap vs. exposure-based pricing — model substrate ready, underwriting curves pending.

Roadmap

Commercial arrangement

Merchant

No active commercial arrangement on record. The plant is selling at market unless a contract is added.

News-extracted facts

4 facts from news enrichment
Extracted facts
Most recent

Context

Summary

Wild Horse is a hybrid wind and solar power plant located in Kittitas County, Washington. The plant, which began operating in 2006, has a total capacity of 273.1 MW and is owned by PUGET HOLDINGS and operated by Puget Sound Energy Inc. It is the second-largest of 17 wind plants in Washington state, and ranks 140th out of 734 nationally. The facility consists of three generators utilizing onshore wind turbine and solar photovoltaic technologies. The balancing authority is Puget Sound Energy, and the plant operates within the WECC NERC region. The wind component of Wild Horse uses Vestas V80-1.8 turbines with a hub height of 67 meters and a rotor diameter of 80 meters. The solar component uses fixed-tilt tracking. The plant's latest annual generation was 590,982 MWh, resulting in a capacity factor of 24.7%. Financial data indicates an installed cost of $1644.05 per kW, with data sourced from FERC filings.

WikipediaWild Horse Wind Farm

The Wild Horse Wind Farm is a 273-megawatt wind farm that generates energy for Puget Sound Energy that consists of one hundred twenty seven 1.8-megawatt Vestas V80 turbines and twenty two 2.0-megawatt Vestas V80 turbines on a 10,800-acre (4,400 ha) site in Kittitas County, Washington, 17 miles (27 km) east of Ellensburg, Washington. The turbines are placed on the high open Shrub-steppe ridge tops of Whiskey Dick Mountain, which was chosen for its energetic wind resource, remote location, and access to nearby power transmission lines. The towers are 221 feet (67 m) tall, and each blade is 129 feet (39 m) long, with a total rotor diameter of 264 feet (80 m), larger than the wingspan of a Boeing 747. The turbines can begin producing electricity with wind speeds as low as 9 mph (14 km/h) and reach full production at 31 mph (50 km/h). They shut down at sustained wind speeds of 56 mph (90 km/h). The site is also home to one of the largest solar array (500 kW) in Washington.

Read on Wikipedia