Q3 Outlook·Fredonia (WA)

1

Natural Gas Fired Combustion Turbine·(SB) Standby/Backup: available for service but not normally used·Fuel NG·on Fredonia (WA)
Nameplate
129.1 MW
Net summer
93.0 MW
Technology
Natural Gas Fired Combustion Turbine
In service
1984-05-01

Performance Analysis

Actuals only · EIA generation — no forecast run yet
Annual generation
109.9GWh
trailing 12 mo · actual
Capacity factor
3.3%
actual · ÷ 376 MW
Peak month
Mar
29.3 GWh
Lowest month
Apr
54 MWh
Historical mean window2015-12 – 2025-12 · 120 mo · mean 26.5 GWh

Dashed line = mean of actual generation over the window above. Adjust to exclude partial/ramp months — a fixed all-history mean can mislead.

Actual (EIA)Hist. meanActual EIA generation — no forecast run yet

Hazard Exposure

Detailed analysis hasn't been run. Modeled hazard populates this section once you run it · modeling_hazard_plant.

~seconds · workspace baseline

Insurance Gap Analysis

Roadmap · unit-level gap when underwriting allows

Coming soon. Per-unit premium gap for unit-priced products (turbine warranties, cell-replacement riders); shared coverage defers to plant-level.

Roadmap
generator_id: 2aef3b39-7fed-413e-b3fd-1c570259b5d4·variant · baseline