- Nameplate
- 75.0 MW
- Net summer
- 75.0 MW
- Technology
- Batteries
- In service
- 2025-07-01
Performance Analysis
Actuals only · EIA generation — no forecast run yet
Annual generation
-12.2GWh
trailing 12 mo · actual
Capacity factor
-1.9%
actual · ÷ 75 MW
Peak month
Jul
-522 MWh
Lowest month
Sep
-3.6 GWh
Historical mean window2025-07 – 2025-12 · 6 mo · mean -2.0 GWh
Dashed line = mean of actual generation over the window above. Adjust to exclude partial/ramp months — a fixed all-history mean can mislead.
Actual (EIA)Hist. meanActual EIA generation — no forecast run yet
Hazard Exposure
Detailed analysis hasn't been run. Modeled hazard populates this section once you run it · modeling_hazard_plant.
~seconds · workspace baseline
Insurance Gap Analysis
Roadmap · unit-level gap when underwriting allows
Coming soon. Per-unit premium gap for unit-priced products (turbine warranties, cell-replacement riders); shared coverage defers to plant-level.