Q3 Outlook·Pluto Energy Storage

PLUTO

Batteries·(OP) Operating·Fuel MWH·on Pluto Energy Storage
Nameplate
75.0 MW
Net summer
75.0 MW
Technology
Batteries
In service
2025-07-01

Performance Analysis

Actuals only · EIA generation — no forecast run yet
Annual generation
-12.2GWh
trailing 12 mo · actual
Capacity factor
-1.9%
actual · ÷ 75 MW
Peak month
Jul
-522 MWh
Lowest month
Sep
-3.6 GWh
Historical mean window2025-07 – 2025-12 · 6 mo · mean -2.0 GWh

Dashed line = mean of actual generation over the window above. Adjust to exclude partial/ramp months — a fixed all-history mean can mislead.

Actual (EIA)Hist. meanActual EIA generation — no forecast run yet

Hazard Exposure

Detailed analysis hasn't been run. Modeled hazard populates this section once you run it · modeling_hazard_plant.

~seconds · workspace baseline

Insurance Gap Analysis

Roadmap · unit-level gap when underwriting allows

Coming soon. Per-unit premium gap for unit-priced products (turbine warranties, cell-replacement riders); shared coverage defers to plant-level.

Roadmap
generator_id: d5108b2d-0f77-4b0d-ba05-b80f6b6dcf45·variant · baseline