Q3 Outlook·Snoqualmie 2

6A

Conventional Hydroelectric·(OP) Operating·Fuel WAT·on Snoqualmie 2
Nameplate
14.4 MW
Net summer
12.6 MW
Technology
Conventional Hydroelectric
In service
2013-02-01

Performance Analysis

Actuals only · EIA generation — no forecast run yet
Annual generation
158.9GWh
trailing 12 mo · actual
Capacity factor
46.9%
actual · ÷ 39 MW
Peak month
Mar
22.0 GWh
Lowest month
Aug
0 MWh
Historical mean window2015-12 – 2024-12 · 109 mo · mean 12.0 GWh

Dashed line = mean of actual generation over the window above. Adjust to exclude partial/ramp months — a fixed all-history mean can mislead.

Actual (EIA)Hist. meanActual EIA generation — no forecast run yet

Hazard Exposure

Detailed analysis hasn't been run. Modeled hazard populates this section once you run it · modeling_hazard_plant.

~seconds · workspace baseline

Insurance Gap Analysis

Roadmap · unit-level gap when underwriting allows

Coming soon. Per-unit premium gap for unit-priced products (turbine warranties, cell-replacement riders); shared coverage defers to plant-level.

Roadmap
generator_id: bbb2ad6f-3330-42d3-9c6b-f220de0a4a4e·variant · baseline