Test

HMV Minster Energy Storage System

EIA plant_id 60299·Public page
Compare with…

Key facts

Capacity
Primary fuel
Status
Operating since
Generators
State
County
ISO / RTO
Balancing authority
Owner
Rank in state
Rank in US

Performance Analysis

Actuals only · EIA generation — no forecast run yet
Annual generation
0MWh
trailing 12 mo · actual
Capacity factor
0.0%
actual · ÷ 7 MW
Peak month
Jan '24
0 MWh
Lowest month
Jan '24
0 MWh
PJM · node 09AMSTRD69 KV BK-1 · hub AEP-DAYTON HUB
Historical mean window2017-01 – 2024-12 · 96 mo · mean 0 MWh

Dashed line = mean of actual generation over the window above. Adjust to exclude partial/ramp months — a fixed all-history mean can mislead.

Actual (EIA)Hist. meanActual EIA generation — no forecast run yet

Hazard Exposure

Detailed analysis hasn't been run. Modeled hazard populates this section once you run it · modeling_hazard_plant.

~seconds · workspace baseline

Insurance Gap Analysis

Roadmap · combines productivity + hazard above

Coming soon. Premium gap vs. exposure-based pricing — model substrate ready, underwriting curves pending.

Roadmap

Generators

1 unit · 7 MW total

Commercial arrangement

Merchant

No active commercial arrangement on record. The plant is selling at market unless a contract is added.

Context

Summary

The HMV Minster Energy Storage System is a 7 MW battery energy storage system located in Auglaize County, Ohio. The plant began operating in 2016 and has one generator. It is owned and operated by Summit Ridge Energy. The primary fuel listed in government data is "MWH", indicating that it draws power from the grid to charge. The facility utilizes lithium-ion batteries (LIB) and has a total storage capacity of 7 MWh, providing a duration of 1 hour at its full 7 MW output. The plant operates within the PJM Interconnection balancing authority, which is part of the RFC NERC region. The HMV Minster Energy Storage System is ranked as the 8th largest of 10 battery storage plants in Ohio, and 919th out of 1205 nationally.