City of Gallup Solar
Key facts
Performance Analysis
Dashed line = mean of actual generation over the window above. Adjust to exclude partial/ramp months — a fixed all-history mean can mislead.
Hazard Exposure
Detailed analysis hasn't been run. Modeled hazard populates this section once you run it · modeling_hazard_plant.
Insurance Gap Analysis
Coming soon. Premium gap vs. exposure-based pricing — model substrate ready, underwriting curves pending.
Generators
Commercial arrangement
No active commercial arrangement on record. The plant is selling at market unless a contract is added.
Context
City of Gallup Solar is an 8 MW solar photovoltaic power plant located in McKinley County, New Mexico. The plant began operating in 2018 and has one generator. Standard Solar is the plant's operator. The facility utilizes single-axis tracking to maximize solar energy capture. It is interconnected to the Public Service Company of New Mexico balancing authority within the Western Electricity Coordinating Council (WECC) NERC region. In its most recent year of operation, City of Gallup Solar generated 9,017 MWh of electricity, achieving a capacity factor of 12.8%. The plant holds the rank of 44 out of 84 power plants in New Mexico, and is ranked 1995 out of 7108 plants nationally. Financial data indicates that the plant sells its power under a power purchase agreement (PPA) at a price of $44.08 per MWh.