Test·Slate Hybrid

SLPWR

Solar Photovoltaic·(OP) Operating·Fuel SUN·on Slate Hybrid
Nameplate
26.0 MW
Net summer
26.0 MW
Technology
Solar Photovoltaic
In service
2022-03-01

Performance Analysis

Actuals only · EIA generation — no forecast run yet
Annual generation
727.2GWh
trailing 12 mo · actual
Capacity factor
18.9%
actual · ÷ 440 MW
Peak month
Jul
99.1 GWh
Lowest month
Dec
13.7 GWh
CAISO · node SLATE_7_N003 · hub TH_NP15_GEN-APND
Historical mean window2021-11 – 2025-12 · 50 mo · mean 55.7 GWh

Dashed line = mean of actual generation over the window above. Adjust to exclude partial/ramp months — a fixed all-history mean can mislead.

Actual (EIA)Hist. meanActual EIA generation — no forecast run yet

Hazard Exposure

Detailed analysis hasn't been run. Modeled hazard populates this section once you run it · modeling_hazard_plant.

~seconds · workspace baseline

Insurance Gap Analysis

Roadmap · unit-level gap when underwriting allows

Coming soon. Per-unit premium gap for unit-priced products (turbine warranties, cell-replacement riders); shared coverage defers to plant-level.

Roadmap
generator_id: f3adce51-8693-4a25-a7ff-00b32141740f·variant · baseline