Test·Bluegrass Solar

BGS

Solar Photovoltaic·(OP) Operating·Fuel SUN·on Bluegrass Solar
Nameplate
79.6 MW
Net summer
79.6 MW
Technology
Solar Photovoltaic
In service
2022-10-01

Performance Analysis

Actuals only · EIA generation — no forecast run yet
Annual generation
149.9GWh
trailing 12 mo · actual
Capacity factor
21.5%
actual · ÷ 80 MW
Peak month
Jul
18.7 GWh
Lowest month
Dec
4.8 GWh
PJM · node PONDTOWN34.5 KV PONDTSP1 · hub WESTERN HUB
Historical mean window2022-10 – 2025-12 · 39 mo · mean 12.5 GWh

Dashed line = mean of actual generation over the window above. Adjust to exclude partial/ramp months — a fixed all-history mean can mislead.

Actual (EIA)Hist. meanActual EIA generation — no forecast run yet

Hazard Exposure

Detailed analysis hasn't been run. Modeled hazard populates this section once you run it · modeling_hazard_plant.

~seconds · workspace baseline

Insurance Gap Analysis

Roadmap · unit-level gap when underwriting allows

Coming soon. Per-unit premium gap for unit-priced products (turbine warranties, cell-replacement riders); shared coverage defers to plant-level.

Roadmap
generator_id: 85e090d6-085d-47f3-8aff-3fda0c433928·variant · baseline