Nachtigall 1836-WD

EIA plant_id 67747·Public page
Compare with…

Key facts

Capacity
Primary fuel
Status
Operating since
Generators
State
County
ISO / RTO
Balancing authority
Owner
Rank in state
Rank in US

Performance Analysis

2026-07 – 2027-06 · 100 paths · uniform
Annual generation
7.6GWh
12-mo mean · node · DA
Capacity factor
18.9%
forecast · ÷ 5 MW
Peak month
Oct
749 MWh
Lowest month
Feb
528 MWh
Node
Market
Metric
CAISO · node CHARCA_12_ND002
Actual history
P10–P90 bandMeanP50P10/P90 = statistical 10th/90th percentile (uncertainty band)
Last computed: 23 days ago · inputs unchanged
Infrasure

Hazard Exposure

Detailed analysis hasn't been run. Modeled hazard populates this section once you run it · modeling_hazard_plant.

~seconds · workspace baseline

Insurance Gap Analysis

Roadmap · combines productivity + hazard above

Coming soon. Premium gap vs. exposure-based pricing — model substrate ready, underwriting curves pending.

Roadmap

Generators

1 unit · 4.6 MW total
Code
Nameplate
Fuel · Prime mover
Status
Modeled CF
Open
NACHT
4.6 MW
SUN · Solar Photovoltaic
(OP) Operating
19.1%

Commercial arrangement

Merchant

No active commercial arrangement on record. The plant is selling at market unless a contract is added.

Context

Summary

Nachtigall 1836-WD is a 4.6 MW solar photovoltaic power plant located in Kern County, California. The plant began operating in 2024 and has one generator. It is owned and operated by Standard Solar. The plant utilizes a fixed tilt solar tracking system. The plant's latest annual generation was 8 MWh, resulting in a capacity factor of 0.0%. Nachtigall 1836-WD operates within the California Independent System Operator (CAISO) balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. It ranks as the 315th largest solar plant in California out of 862, and 3234th nationally out of 7108.