Test·Long Point Solar

GEN1

Solar Photovoltaic·(OP) Operating·Fuel SUN·on Long Point Solar
Nameplate
120.0 MW
Net summer
120.0 MW
Technology
Solar Photovoltaic
In service
2025-12-01

Performance Analysis

Actuals only · EIA generation — no forecast run yet
Annual generation
429MWh
trailing 12 mo · actual
Capacity factor
0.0%
actual · ÷ 120 MW
Peak month
Dec
429 MWh
Lowest month
Dec
429 MWh
ERCOT · node RN_LNP_SLR · hub HB_HOUSTON
Historical mean window2025-12 – 2025-12 · 1 mo · mean 429 MWh

Dashed line = mean of actual generation over the window above. Adjust to exclude partial/ramp months — a fixed all-history mean can mislead.

Actual (EIA)Hist. meanActual EIA generation — no forecast run yet

Hazard Exposure

Detailed analysis hasn't been run. Modeled hazard populates this section once you run it · modeling_hazard_plant.

~seconds · workspace baseline

Insurance Gap Analysis

Roadmap · unit-level gap when underwriting allows

Coming soon. Per-unit premium gap for unit-priced products (turbine warranties, cell-replacement riders); shared coverage defers to plant-level.

Roadmap
generator_id: 197f8fc4-1ed1-49db-96f8-6aa4df046c41·variant · baseline