Test·AC IL - Hillsboro

HILLS

Solar Photovoltaic·(TS) Construction complete, but not yet in commercial operation·Fuel SUN·on AC IL - Hillsboro
Nameplate
5.0 MW
Net summer
5.0 MW
Technology
Solar Photovoltaic
Planned
2026-01-01

Performance Analysis

2026-07 – 2027-06 · 100 paths · uniform
Annual generation
8.2GWh
12-mo mean · hub · DA
Capacity factor
18.7%
forecast · ÷ 5 MW
Peak month
Sep
771 MWh
Lowest month
Dec
468 MWh
Node
Market
Metric
MISO · hub ILLINOIS.HUB
P10–P90 bandMeanP50P10/P90 = statistical 10th/90th percentile (uncertainty band)
Last computed: 23 days ago · inputs unchanged
Infrasure

Hazard Exposure

Detailed analysis hasn't been run. Modeled hazard populates this section once you run it · modeling_hazard_plant.

~seconds · workspace baseline

Insurance Gap Analysis

Roadmap · unit-level gap when underwriting allows

Coming soon. Per-unit premium gap for unit-priced products (turbine warranties, cell-replacement riders); shared coverage defers to plant-level.

Roadmap
generator_id: 5aa9f8c2-dc9c-43d0-b175-43ac995ae0d1·variant · baseline