Key facts

Capacity
Primary fuel
Status
Operating since
Generators
State
County
ISO / RTO
Balancing authority
Owner
Rank in state
Rank in US

Performance Analysis

Actuals only · EIA generation — no forecast run yet
Annual generation
317.8GWh
trailing 12 mo · actual
Capacity factor
34.6%
actual · ÷ 105 MW
Peak month
Oct
52.9 GWh
Lowest month
Apr
13.0 GWh
Historical mean window2015-12 – 2024-12 · 109 mo · mean 26.9 GWh

Dashed line = mean of actual generation over the window above. Adjust to exclude partial/ramp months — a fixed all-history mean can mislead.

Actual (EIA)Hist. meanActual EIA generation — no forecast run yet

Hazard Exposure

Detailed analysis hasn't been run. Modeled hazard populates this section once you run it · modeling_hazard_plant.

~seconds · workspace baseline

Insurance Gap Analysis

Roadmap · combines productivity + hazard above

Coming soon. Premium gap vs. exposure-based pricing — model substrate ready, underwriting curves pending.

Roadmap

Generators

2 units · 104.8 MW total

Commercial arrangement

Merchant

No active commercial arrangement on record. The plant is selling at market unless a contract is added.

Context

Summary

Located in Whatcom County, Washington, the Upper Baker hydroelectric plant has a total capacity of 104.8 MW. The plant began operating in 1959 and utilizes conventional hydroelectric technology with water as its primary fuel source. It consists of two generators. Puget Sound Energy Inc. operates the facility, which is owned by PUGET HOLDINGS. The plant's balancing authority is Puget Sound Energy, and it operates within the WECC NERC region. In the most recent year of reported data, Upper Baker generated 317,831 MWh, achieving a capacity factor of 34.5%. The plant's installed cost was $1,563.55 per kW. Upper Baker ranks as the 22nd largest power plant out of 23 in Washington state, and 178th out of 194 nationally. Financial data for the plant is available from FERC filings.

WikipediaUpper Baker Dam

Upper Baker Dam is a dam spanning the Baker River in northern Washington in the United States of America. It is one of two dams on the river, the other one being the Lower Baker Dam a few miles downstream. The dam is used to generate hydroelectricity and provide flood control.

Read on Wikipedia