Q3 Outlook·Upper Baker

1

Conventional Hydroelectric·(OP) Operating·Fuel WAT·on Upper Baker
Nameplate
52.4 MW
Net summer
52.4 MW
Technology
Conventional Hydroelectric
In service
1959-01-01

Performance Analysis

Actuals only · EIA generation — no forecast run yet
Annual generation
317.8GWh
trailing 12 mo · actual
Capacity factor
34.6%
actual · ÷ 105 MW
Peak month
Oct
52.9 GWh
Lowest month
Apr
13.0 GWh
Historical mean window2015-12 – 2024-12 · 109 mo · mean 26.9 GWh

Dashed line = mean of actual generation over the window above. Adjust to exclude partial/ramp months — a fixed all-history mean can mislead.

Actual (EIA)Hist. meanActual EIA generation — no forecast run yet

Hazard Exposure

Detailed analysis hasn't been run. Modeled hazard populates this section once you run it · modeling_hazard_plant.

~seconds · workspace baseline

Insurance Gap Analysis

Roadmap · unit-level gap when underwriting allows

Coming soon. Per-unit premium gap for unit-priced products (turbine warranties, cell-replacement riders); shared coverage defers to plant-level.

Roadmap
generator_id: 7836625c-34c2-41c8-bf9c-97a04e6673b0·variant · baseline