Annual generation
1.72TWh
trailing 12 mo · actual
Capacity factor
61.6%
actual · ÷ 318 MW
Peak month
Oct
187.5 GWh
Lowest month
Jun
37.3 GWh
Historical mean window2015-12 – 2024-12 · 109 mo · mean 100.6 GWh

Dashed line = mean of actual generation over the window above. Adjust to exclude partial/ramp months — a fixed all-history mean can mislead.

Actual (EIA)Hist. meanActual EIA generation — no forecast run yet

Hazard Exposure

Detailed analysis hasn't been run. Modeled hazard populates this section once you run it · modeling_hazard_plant.

~seconds · workspace baseline

Insurance Gap Analysis

Roadmap · combines productivity + hazard above

Coming soon. Premium gap vs. exposure-based pricing — model substrate ready, underwriting curves pending.

Roadmap

Generators

2 units · 318.3 MW total· modeled at plant

Commercial arrangement

Merchant

No active commercial arrangement on record. The plant is selling at market unless a contract is added.

Context

Summary

Frederickson Power LP is a 318.3 MW natural gas-fired combined cycle power plant located in Pierce County, Washington. The plant began operating in 2002 and is owned by Puget Holdings. It is operated by Frederickson Power LP and consists of two generators. The plant is within the Bonneville Power Administration balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. In the most recent year of data, Frederickson Power LP generated 1,717,651 MWh of electricity, achieving a capacity factor of 61.5%. The plant is ranked as the 5th largest of 13 power plants in Washington state, and 625th out of 945 nationally. Financial data indicates an installed cost of $516.24 per kW, according to FERC filings.