Q3 Outlook·Frederickson Power LP

FICT

Natural Gas Fired Combined Cycle·(OP) Operating·Fuel NG·on Frederickson Power LP
Nameplate
192.0 MW
Net summer
164.0 MW
Technology
Natural Gas Fired Combined Cycle
In service
2002-08-01

Performance Analysis

Actuals only · EIA generation — no forecast run yet
Annual generation
1.72TWh
trailing 12 mo · actual
Capacity factor
61.6%
actual · ÷ 318 MW
Peak month
Oct
187.5 GWh
Lowest month
Jun
37.3 GWh
Historical mean window2015-12 – 2024-12 · 109 mo · mean 100.6 GWh

Dashed line = mean of actual generation over the window above. Adjust to exclude partial/ramp months — a fixed all-history mean can mislead.

Actual (EIA)Hist. meanActual EIA generation — no forecast run yet

Hazard Exposure

Detailed analysis hasn't been run. Modeled hazard populates this section once you run it · modeling_hazard_plant.

~seconds · workspace baseline

Insurance Gap Analysis

Roadmap · unit-level gap when underwriting allows

Coming soon. Per-unit premium gap for unit-priced products (turbine warranties, cell-replacement riders); shared coverage defers to plant-level.

Roadmap
generator_id: acb0d3cc-9dbb-48ef-9273-68f9a883adeb·variant · baseline