Q3 Outlook

Beaver Creek Wind Facility

EIA plant_id 65019·Public page
Compare with…

Key facts

Capacity
Primary fuel
Status
Operating since
Generators
State
County
ISO / RTO
Balancing authority
Owner
Rank in state
Rank in US

Performance Analysis

Actuals only · EIA generation — no forecast run yet
Annual generation
161.3GWh
trailing 12 mo · actual
Capacity factor
7.4%
actual · ÷ 248 MW
Peak month
Dec
66.0 GWh
Lowest month
Aug
11.3 GWh
Historical mean window2025-08 – 2025-12 · 5 mo · mean 32.3 GWh

Dashed line = mean of actual generation over the window above. Adjust to exclude partial/ramp months — a fixed all-history mean can mislead.

Actual (EIA)Hist. meanActual EIA generation — no forecast run yet

Hazard Exposure

Detailed analysis hasn't been run. Modeled hazard populates this section once you run it · modeling_hazard_plant.

~seconds · workspace baseline

Insurance Gap Analysis

Roadmap · combines productivity + hazard above

Coming soon. Premium gap vs. exposure-based pricing — model substrate ready, underwriting curves pending.

Roadmap

Commercial arrangement

Merchant

No active commercial arrangement on record. The plant is selling at market unless a contract is added.

News-extracted facts

7 facts from news enrichment
Extracted facts
Most recent
Developer (news)

Context

Summary

Beaver Creek Wind Facility is a 248 MW wind power plant located in Stillwater County, Montana. The facility began operating in 2025 and utilizes onshore wind turbine technology. It consists of 4 generators and is owned by Puget Holdings, with Puget Sound Energy Inc. serving as the operator. The plant's primary fuel source is wind (WND). Beaver Creek Wind Facility operates within the NorthWestern Energy (NWMT) balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. It is the third-largest wind farm in Montana out of 11, and ranks 180th nationally out of 734 wind facilities.