Q3 Outlook·Beaver Creek Wind Facility

BCW2

Onshore Wind Turbine·(OP) Operating·Fuel WND·on Beaver Creek Wind Facility
Nameplate
62.0 MW
Net summer
16.8 MW
Technology
Onshore Wind Turbine
In service
2025-08-01

Performance Analysis

Actuals only · EIA generation — no forecast run yet
Annual generation
161.3GWh
trailing 12 mo · actual
Capacity factor
7.4%
actual · ÷ 248 MW
Peak month
Dec
66.0 GWh
Lowest month
Aug
11.3 GWh
Historical mean window2025-08 – 2025-12 · 5 mo · mean 32.3 GWh

Dashed line = mean of actual generation over the window above. Adjust to exclude partial/ramp months — a fixed all-history mean can mislead.

Actual (EIA)Hist. meanActual EIA generation — no forecast run yet

Hazard Exposure

Detailed analysis hasn't been run. Modeled hazard populates this section once you run it · modeling_hazard_plant.

~seconds · workspace baseline

Insurance Gap Analysis

Roadmap · unit-level gap when underwriting allows

Coming soon. Per-unit premium gap for unit-priced products (turbine warranties, cell-replacement riders); shared coverage defers to plant-level.

Roadmap
generator_id: 2f2c761a-bf61-4659-9ae0-dd06b250d1cd·variant · baseline