Jericho

EIA plant_id 69096·Public page
Compare with…

Key facts

Capacity
Primary fuel
Status
Operating since
Generators
State
County
ISO / RTO
Balancing authority
Owner
Rank in state
Rank in US

Performance Analysis

Actuals only · EIA generation — no forecast run yet
Annual generation
0MWh
trailing 12 mo · actual
Capacity factor
0.0%
actual · ÷ 5 MW
Peak month
Jan '24
0 MWh
Lowest month
Jan '24
0 MWh
NYISO · node — · hub GENESE
Historical mean window2024-01 – 2024-12 · 12 mo · mean 0 MWh

Dashed line = mean of actual generation over the window above. Adjust to exclude partial/ramp months — a fixed all-history mean can mislead.

Actual (EIA)Hist. meanActual EIA generation — no forecast run yet

Hazard Exposure

Detailed analysis hasn't been run. Modeled hazard populates this section once you run it · modeling_hazard_plant.

~seconds · workspace baseline

Insurance Gap Analysis

Roadmap · combines productivity + hazard above

Coming soon. Premium gap vs. exposure-based pricing — model substrate ready, underwriting curves pending.

Roadmap

Generators

1 unit · 5 MW total
Code
Nameplate
Fuel · Prime mover
Status
Modeled CF
Open
JERIC
5 MW
SUN · Solar Photovoltaic
(OP) Operating

Commercial arrangement

Merchant

No active commercial arrangement on record. The plant is selling at market unless a contract is added.

Context

Summary

The Jericho solar photovoltaic plant is located in Allegany County, New York. The plant has a total capacity of 5 MW and consists of a single generator. It commenced operations in 2024 and is owned and operated by Bullrock-NxtGenREA. The plant utilizes a fixed tilt solar tracking system. Jericho operates within the New York Independent System Operator (NYISO) balancing authority and the Northeast Power Coordinating Council (NPCC) NERC region. It is the 98th largest solar plant in New York out of 695, and ranks 2568th nationally out of 7108 solar plants. The plant's primary fuel source is solar energy.