Jericho
Key facts
Performance Analysis
Dashed line = mean of actual generation over the window above. Adjust to exclude partial/ramp months — a fixed all-history mean can mislead.
Hazard Exposure
Detailed analysis hasn't been run. Modeled hazard populates this section once you run it · modeling_hazard_plant.
Insurance Gap Analysis
Coming soon. Premium gap vs. exposure-based pricing — model substrate ready, underwriting curves pending.
Generators
Commercial arrangement
No active commercial arrangement on record. The plant is selling at market unless a contract is added.
Context
The Jericho solar photovoltaic plant is located in Allegany County, New York. The plant has a total capacity of 5 MW and consists of a single generator. It commenced operations in 2024 and is owned and operated by Bullrock-NxtGenREA. The plant utilizes a fixed tilt solar tracking system. Jericho operates within the New York Independent System Operator (NYISO) balancing authority and the Northeast Power Coordinating Council (NPCC) NERC region. It is the 98th largest solar plant in New York out of 695, and ranks 2568th nationally out of 7108 solar plants. The plant's primary fuel source is solar energy.