Test·Jericho

JERIC

Solar Photovoltaic·(OP) Operating·Fuel SUN·on Jericho
Nameplate
5.0 MW
Net summer
5.0 MW
Technology
Solar Photovoltaic
In service
2024-10-01

Performance Analysis

Actuals only · EIA generation — no forecast run yet
Annual generation
0MWh
trailing 12 mo · actual
Capacity factor
0.0%
actual · ÷ 5 MW
Peak month
Jan '24
0 MWh
Lowest month
Jan '24
0 MWh
NYISO · node — · hub GENESE
Historical mean window2024-01 – 2024-12 · 12 mo · mean 0 MWh

Dashed line = mean of actual generation over the window above. Adjust to exclude partial/ramp months — a fixed all-history mean can mislead.

Actual (EIA)Hist. meanActual EIA generation — no forecast run yet

Hazard Exposure

Detailed analysis hasn't been run. Modeled hazard populates this section once you run it · modeling_hazard_plant.

~seconds · workspace baseline

Insurance Gap Analysis

Roadmap · unit-level gap when underwriting allows

Coming soon. Per-unit premium gap for unit-priced products (turbine warranties, cell-replacement riders); shared coverage defers to plant-level.

Roadmap
generator_id: 8d301dd0-6dbd-4cee-ae67-f6d7836bc8c8·variant · baseline